Austin Care Home, Alvechurch, Birmingham
Project Details:
Austin Care Home, nestled in Alvechurch, Birmingham, is a distinguished facility that prioritises the well-being and comfort of its residents. The establishment has recently undergone significant interior enhancements, ensuring that its infrastructure meets the highest standards of quality and design.
One of the standout features of the renovation at Austin Care Home is the incorporation of metal stud partitions. These partitions are not just about providing structural integrity; they also offer a high degree of flexibility regarding space allocation and design. With these partitions in place, the facility can tailor each of the 80 bedrooms to its residents’ unique needs and preferences, ensuring a personalised living experience.
Complementing the metal stud partitions is extensive plaster boarding throughout the building. This material is a robust and smooth wall base, ensuring durability and a refined appearance. It’s a crucial step in ensuring that the walls are ready for the subsequent stages of interior decoration.
The final touch in this renovation process is skimming. This technique refines the surface of the plasterboard, ensuring a seamless and blemish-free finish. It prepares the walls for any decorative treatments, be it painting or wallpapering, guaranteeing a polished look throughout the facility.
What’s particularly commendable about this entire renovation project at Austin Care Home is the efficiency with which it was executed. The team managed to complete the extensive work for the 80-bedroom building a full two weeks ahead of the projected deadline, showcasing not only their dedication but also their expertise and commitment to excellence.
Services Provided: Metal stud partitions, plaster boarding and skimming for the 80-bedroom building – completed two weeks before the deadline.